Setup for Lot Tracked Materials

Raw material items are required to be set as “Lot Tracked” in order to have full material cert traceability.

image.png

Associating a Raw Material Cert When Receiving a PO

When the lot tracked material is received the user will be required to enter the "Lot Number"

If two different lots of material were received, enter the first lot qty in “New Receipt” then select the + to add a new lot

image.png

Within the line item, select “+Add” to attach the cert. This will need to be done for every lot of material being received. Be sure to check “Is Certification”

image.png

Lot Tracked Material in Inventory

The lot # will be displayed in your inventory for the item

image.png

To view certs for existing inventory, select “Certifications”

image.png